Genesis Fortune · Engineering services
Building recertification engineering in Miami
Electrical and structural inspection coordination, report preparation, and technical support for building recertification.
Request an Engineering ProposalReceived a recertification notice? Start with the property details
Genesis Fortune helps building owners, associations, and property managers define the engineering work needed for recertification. Send the notice, property address, building information, available records, and relevant prior reports so the requirements and investigation scope can be reviewed.
Recertification is not simply a standard report applied to every property. Building characteristics, jurisdiction, prior inspections, notices, and available access affect the scope. The proposal should identify the electrical and structural inspection responsibilities, documentation, and coordination included.
Why “40-year recertification” does not describe every current schedule
Many owners still search for 40-year recertification because that term has long been associated with older-building inspections. Current programs can use different age thresholds and recurring cycles depending on the building and jurisdiction. Miami-Dade County publishes the applicable program guidance and notices.
Use the property’s official notice and current jurisdiction requirements to establish the actual schedule. Do not wait for an assumed 40th year if the property is already subject to an earlier requirement. Building recertification, condominium milestone inspections, and structural integrity reserve studies are distinct processes; one should not be assumed to satisfy the others.
Electrical and structural inspection coordination
The engineering scope can include review of available records, accessible-system observations, photo documentation, findings, and preparation of the relevant reports. Appropriate electrical and structural design professionals address their respective technical scopes.
Existing reports, permit history, repair records, and known concerns can help focus the investigation. Inspection limitations and inaccessible conditions should be identified clearly. A report describes the observations and professional assessment within its scope; it does not replace ongoing maintenance or resolve undocumented conditions automatically.
Thermography and other supporting requirements
Electrical recertification can involve supporting infrared inspections under the applicable program. Miami-Dade’s published guidance includes thermography for electrical systems operating at 400 amperes or greater. Requirements must be reviewed against the actual property and the reviewing authority’s current guidance.
Other supporting items, such as illumination or guardrail documentation, may be relevant depending on the property. We review the notice and scope to determine which services need coordination. Thermography, electrical load studies, and structural inspections address different questions and should be scoped accordingly.
If repairs or further investigation are identified
Inspection findings may require additional investigation, repairs, design documents, permitting, or follow-up inspections. The initial recertification scope should make clear whether those later services are included or require a separate engagement.
Genesis Fortune can help define the next engineering steps. If construction is needed, Genesis Prime Group can propose a separate repair or construction scope. Agency acceptance depends on the applicable requirements and submitted information; no engineering proposal guarantees a successful recertification outcome.
Information for a recertification proposal
Provide the property address, official notice, building age and use if known, number of stories, available plans and previous reports, known electrical or structural concerns, and the notice deadline. Tell us about access restrictions and whether the building is occupied.
We will review the starting information, identify the required professional scopes and investigations, and prepare a proposal. Genesis Fortune supports South Florida property teams, with each engagement reviewed for the specific jurisdiction and building requirements.
Project questions
Should I wait until the building is 40 years old?
No. The applicable notice and current jurisdiction requirements determine the schedule. Some properties are subject to earlier thresholds.
Is recertification the same as a milestone inspection or SIRS?
No. These processes have different purposes and requirements. Review the property’s obligations rather than assuming one service covers all three.
Can you help after a report identifies repairs?
Engineering investigation, repair design, permitting coordination, or follow-up services can be scoped separately as needed.
Official guidance
Current requirements and property-specific instructions come from the applicable authority. Review the official guidance alongside your notice or project records.
Miami-Dade County guidance ↗Define the right engineering scope.
Tell us the property address, available records, and the work you need. The team will review the starting information and discuss a proposal.
Request an Engineering Proposal Call 305-570-8520